CD 22-03 - Harris Creek Interceptor Construction Drawings - Off-site sewer improvements along Harris Creek on multiple properties in Town's Extraterritorial Jurisdiction (ETJ). Project is related to The Point project. Proposes 418 LF of 18" sewer line, 3,469 LF of 24" sewer line, and 13 manholes. See this City of Raleigh Utility Department webpage about the project.
- 1st Submittal -- Received 2021-11-09. Not officially reviewed by TOR TRC Staff.
- 2nd Submittal -- Received 2022-06-08; on review 2022-06-27; Comments published 2022-07-08.
- 3rd Submittal - Received 2022-09-23, on review 2022-09-30, Comments published 2022-10-12. There are no further Comments, and Applicant is to attain signatures on Signature set of plans.
- 4th Submittal - Received 2023-09-20, on review ASAP by City of Raleigh Utility Department; comments published 2023-11-05.
FSP-23-04 - Point South Phases 1, 2, 6, 9 - Final Subdivision Plat to record 266 residential lots and 12 open space lots, pursuant to CD 20-06 (as revised), PR 20-01, and SUP 18-09.
- 1st Submittal received 2023-05-01; on TRC-STAFF review 2023-05-04; comments published 2023-06-05.
- 2nd Submittal received 2023-06-15; on TRC-STAFF Review in JULY; comments published 2023-08-02.
CID-24-01 - Point South Phases 8 & 14 (aka Package #3) - Construction Infrastructure Drawings for Phases * & 14, for 178 total residential lots - 64 Single Family Detached (SFD), lots 739-802, and 114 Single-family Attached (Townhomes, TH) being lots 624-738 (total Lot range 624 - 802).
- 1st Submittal received 2023-12-13; on TRC-STAFF review during JANUARY 2024; comments published on 2024-02-05. ** Note - CD Plan set is broken into two (2) parts for file size purposes -- Plan Set 1 is the first 37/74 sheets, Cover to C6.18A / Plan Set 2 is the last 37/74 sheets, C6.13B to L5.20 .
- 2nd Submittal received 2023-03-01; on TRC-STAFF review during MARCH 2024; comments published on 2024-04-02. ** Note - CD Plan set is broken into two (2) parts for file size purposes -- Plan Set 1 is the first 33/77 sheets, Cover to C5.10 / Plan Set 2 is the last 44/77 sheets, C6.00 to L5.20 .
- 3rd Submittal received 2024-05-02; on TRC-STAFF review during MAY 2024; comments to be published on/by 2024-06-10. ** Note - CD Plan set is broken into two (2) parts for file size purposes -- Plan Set 1 is the first 60/77 sheets, Cover to C8.03 / Plan Set 2 is the last 17/77 sheets, C8.04 to L5.20 .
REVISION to CD 20-08, Point South Phases 3,4,5,7,10 (aka Package #2) - Under Review - Submittal to review specific aspects on 8 Sheets being C2.11 (Site Plan Area K); C3.11 (Grading and Storm Drainage Plan Area K); C3.15 (Grading and Storm Drainage Plan Area "O"); C5.00 (Plan & Profile, Stormwater Control Measure "J" Plans); C9.00J/C9.01J/C9.02J/C9.03J (Stormwater Control Measure "J" Plan View, Details, and Landscape Plans); Revised SIA and Storm Drainage Calculations.
- 1st Submittal received 2024-01-15; on TRC-STAFF review during FEBRUARY 2024; comments published on February 19, 2024.
- 2nd Submittal received 2024-02-21; on TRC-STAFF review during MARCH 2024; comments published on xx03/04/2024-No further comments.
Resources
Developer
Ashton Residential Raleigh LLC
900 Ridgefield Drive, Suite 335
Raleigh, NC 27609
Engineer
McAdams
2905 Meridian Parkway
Durham, NC 27713
Documents
SUP 18-09 - Special Use Permit - APPROVED 2019-08-20
PR 20-01 - Point SOUTH - Phases 1-10 & 14 - Preliminary Plat - Approved 2020-10-06
- PR 20-01 The Point SOUTH Ph 1-10 & 14 Preliminary Plat Recommended for Approval - Part 1
- PR 20-01 The Point SOUTH Phases 1-10 & 14 Preliminary Plat Recommended for Approval - Part 2
- Planning Board Mtg MINUTES for 09-28-2020
- Town Board of Commissioners Mtg AGENDA for 10-06-2020
- Item C.3. of Town Board of Commissioners Mtg. 10-06-2020.
- Town Board of Commissioners Mtg MINUTES for 10-06-2020
ANX 20-05 - Annexation - APPROVED 2021-05-24
CD 20-06 - The Point SOUTH - Package 1 - Ph 1, 2, 6, & 9 - APPROVED 2022-04-25
SP 22-04 - Amenity Center Site Plan - APPROVED 2023-03-17
CD 20-06 REVISION - APPROVED 2023-03-20
CD 22-03 - Harris Creek Sewer improvements - 3rd Submittal
FSP-23-04 - Phases 1,2,6,9 Final Plat-1st submittal
FSP-23-04 - Phases 1,2,6,9 Final Plat-2nd submittal
- V2 - Property Owner Consent Form
- V2 - Response to V1 Comments
- V2 - REVISED Final Subdivision Plat (no date)
- V2 - Street Light Pole Plan info
- V2 - SUP 18-09 Conditions (signed)
- V2 - Comments-SUMMARY - READ FIRST
- V2 - Street Light Pole Staff numbering analysis
- V2 - Public ROW Street Light Pole exhibit - 66
FSP-23-04 - Phases 1,2,6,9 Final Plat-3rd submittal
CD 22-03 - Harris Creek Interceptor - V4
CID-24-01 - Ph 8, 14 aka Pkg #3 - V1
- V1 - Application for CID-24-01
- V1 - Package 3 Storm Drainage Report dated 11-17-23
- V1 - SIA report dated December 2023
- V1 - Overall Water Distribution analysis dated 08-02-2021
- V1 - CD Plan Set part 1, first 37 Shts, Cover to C6.18A
- V1 - CD Plan Set part 2, last 37 Shts, C6.13B - L5.20
- V1 - Comments - SUMMARY - READ FIRST
- V1 - Comments - ENGINEERING Memo dated 1-30-24
- V1 - Comments - ENGINEERING Mark-ups_Plan Set 1
- V1 - Comments - ENGINEERING Mark-ups_Plan Set 2
- V1 - Comments - ENGINEERING Mark-ups_SIA report
- V1 - Comments - ENGINEERING Mark-ups_Storm Drainage Report
- V1 - Comments-NCDOT-TIA Cong Mgmt Report-YoungStPUD
- V1 - Comments-CORPUD - Mark-ups Plan set 1
CD 22-03 - V4 Harris Creek Interceptor
REVISION to CD 20-08 - Ph 3,4,5,7,10 aka Pkg #2 - V2
CID-24-01 - Ph 8, 14 aka Pkg #3 - V2
- V2 - Response to V1 comments
- V2 - Downstream Analysis 2-29-24
- V2-COR Pub Gravity Sewer App
- V2-COR Pub Water App etc
- V2 - SIA report 2-29-24
- V2 - Storm Drainage Calc report
- V2 - CD Plan Set part 1/2, first 33 Shts, Cover to C5.10
- V2 - CD Plan Set part 2/2, last 44 Shts, C6.00 to L5.20
- V2 - COMMENTS_SUMMARY - READ FIRST
- V2 - Comments-ENGINEERING - Memo dated 4-2-24
- V2 - Comments-ENGINEERING - Markups on Part 1 Plan Set
- V2 - Comments-ENGINEERING - Markups Storm Drainage Calc report