Wallbrook - Under Review

This webpage contains all the Development Applications that are currently Submitted and Under Review by the Town Technical Review Committee and/or Town Planning Board/Board of Commissioners (depending on the type of application).  Once an Application achieves its final Approval, those records will be moved to the "Wallbrook - Approvals" webpage.


 CD 22-06 - Construction Drawings for Off-site sewer line improvements located along/near Virginia Water Drive near the boundary of the Carlton Pointe and Villages of Rolesville subdivisions, and within PIN 1758651927 open space lot.  This application is submitted and being reviewed under the Land Development Ordinance (LDO)

- 1st Submittal received 10/28/2022 / Comments published on 12/04/2022 / 2nd Submittal received 12/29/22 / Comments published on 02/01/2023 3rd Submittal received 02/28/23 / Comments published on 04/06/2023.

- 04/06/23 - Applicant is to attain Signatures of Wake County Environmental, Town, and COR-PUD, and provide fully signed plan set to Town. 

 

CD 22-02 REVISION - A Revision to the previously approved Construction Drawings for mass grading & sewer line realignmentThis application is regulated under the Land Development Ordinance (LDO). 

- 1st Submittal rcvd 02-01-2023 - Comments published 03/06/2023.  Awaiting a Resubmittal.

CID-23-01 - Construction Infrastructure Drawings for Roadway Improvements including Wallbrook Drive and Virginia Water Drive within the Wallbrook subdivision. This application was submitted/reviewed/Approved under the Land Development Ordinance (LDO). 

- 1st Submittal rcvd 02-01-2023  - Comments published 03/06/2023.

- 2nd Submittal rcvd 06-23-23 - on TRC-STAFF Review during July, comments published on 07/27/2023.

CID-23-02 - Construction Infrastructure Drawings for Lots 1A, 1B, 1C, and 2 within the Wallbrook subdivision. This includes 3 lots for retail/commercial uses (incl. Publix) and the primary stormwater control measure (pond). Original CD Plan set file over 100KB, is broken into 4 parts to allow uploading to Town webpage. This application was submitted/reviewed/Approved under the Land Development Ordinance (LDO). 

- 1st Submittal rcvd 03-03-2023 - Comments published 04/05/2023.   Awaiting a Resubmittal.

SP 22-03 REVISION - Site Plan for Lots 1A, 1B, 1C, and 2 from REVISED PR 21-04, to construct Buildings 1,2,3,4 including PUBLIX.  This application was submitted/reviewed/Approved under the Land Development Ordinance (LDO). 

- 1st Submittal rcvd 03-03-2023 - Comments published 03/30/2023.   Awaiting a Resubmittal.

SDP-23-04 - Site Development Plan of Lot 11 of the Wallbrook commercial development for a 7-Eleven convenience store/gas station .

- 1st Submittal Received 05-01-23 - Comments published on 05/25/2023.

- 2nd Submittal received 06/01/2023; on TRC-STAFF review during JUNE 2023; Comments published on 06-23-2023.   

- 3rd Submittal received 03/01/2024; on TRC-STAFF review during MARCH 2024; Comments published on 04-05-2024. 

  -- Wake Co. Permit SEC-119905-2024/SWF-119905-2024 Disapproval dated 4-5-2024. 

- 4th Submittal received 05/01/2024; on TRC-STAFF review during MAY 2024; Comments to be published on/by 06-10-2024. 

CID-23-04 - Construction Infrastructure Drawings for the (north/west side of S. Main Street) extension of Virginia Water Drive (as a cul-de-sac street).

- 1st Submittal Received 05-01-23 - Comments published on 05/25/2023.

- 2nd Submittal received 06/01/2023; on TRC-STAFF review during JUNE 2023; Comments published on 06/23/2023.  

- 3rd Submittal received 03/01/2024; on TRC-STAFF review during MARCH 2024; Comments published on 04/06/2024.  

- 3rd Submittal received 03/01/2024; on TRC-STAFF review during MARCH 2024; Comments published on 04/06/2024. 

 

 

MOVE TO APPROVED ----  SDP-23-05 - Site Development Plan + Construction Infrastructure Drawings for Lots 1A, 1B, 1C, 2, and 3 (portion) for development of Publix grocery store building, 3 other retail buildings, parking lots and landscaping, and infrastructure including stormwater control measure to serve this development.  * Submittal combines SDP-23-05 and CID-23-01, Construction Drawings for the 2 public roadways in the subdivision (Virginia Water Drive and Wallbrook Drive).  Plans should be reviewed as one single plan set of both on-lot site development and associated off-site public infrastructure construction.

 

PSP-24-01 - Wallbrook Lot 5 (Boat Tract) - Preliminary Subdivision Plat of Lot 5 per PR 21-04 and FSP-23-09 into 4 lots (xxxxx)

- 1st Submittal received 04/01/2024; on TRC-STAFF review during APRIL 2024; Comments published on 05/02/2024.  

CID-24-02 - Construction Infrastructure Drawings for Lot 7, for mass grading and erosion control purposes.  his application is submitted/reviewed/Approved under the Land Development Ordinance (LDO). 

- 1st Submittal rcvd 04-01-2024, on review during APRIL 2024; Comments published 05/01/2024

CID-24-03 - Construction Infrastructure Drawings for Lot 8, for mass grading and erosion control purposes. This application is submitted/reviewed/Approved under the Land Development Ordinance (LDO). 

- 1st Submittal rcvd 04-01-2024, on review during APRIL 2024; Comments published 05/01/2024.  

FSP-24-09 - Wallbrook Tract A (Lots 3 & 4) - Final Subdivision Plat to record lots 3 and 4 pursuant to PR 21-04 and FSP-23-09.

- 1st Submittal rcvd 04-04-2024, on review during MAY 2024; Comments to be published by/before 06/10/2024.

SDP-24-03 - Chase Bank Wallbrook - Site Development of (currently proposed Lot 5A per PSP-24-01) for a commercial bank office.

- 1st Submittal rcvd 04-29-2024, on review during MAY 2024; Comments to be published by/before 06/10/2024.

Documents

CD 22-06 - Off-site Sewer Improvements - 3rd Submittal

CID-23-04 - Wallbrook/Va Water Dr Ext. - 4th submittal