** ALL DEVELOPMENT APPLICATIONS WILL BE REVIEWED UNDER THE LAND DEVELOPMENT ORDINANCE (LDO).
Parker Ridge is a proposed residential subdivision comprising up to 162 single-family detached lots and homes, and 114 single-family attached lots (Townhomes) across approximately 88.5 acres.
ANX 22-06 - Voluntary Annexation Request- APPROVED 03/07/2023
MA 22-03 - Map Amendment (Rezoning) Request- APPROVED 03/07/2023
PSP-23-02 - Major Preliminary Subdivision Plat - APPROVED 12/ 22/ 2023
CID-23-06 - Construction Infrastructure Drawings - APPROVED 12/ 22/ 2023
SDP-24-10 - Site Development Plan - APPROVED 2025-05-17 TOR / _____ WC / _____ COR - Site Development Plan to develop a part of Open Space 04B, addressed as 506 Cavalera Drive, as an amenity center within the Parker Ridge subdivision. Four (4) submittals reviewed by TRC Staff between November 2024 and May 2025.
DORMANT APPLICATIONS
CID-23-07 - Construction Infrastructure Drawings - UNDER REVIEW - Pursuant to MA 22-03 (and PSP-23-02), subdivision infrastructure plans for the off-site improvement to create a driveway at E. Young Street (related to Access D through Town Campus property, see MA 22-03). V1 Submittal - July-August 2023 / V2 Submittal October-November 2023.
*Files removed from this webpage 5/17/2025.
CID-23-08 - Construction Infrastructure Drawings - UNDER REVIEW -Pursuant to MA 22-03. infrastructure plans for an off-site public street (Access D, aka Young Street connector). V1 Submittal - July-August 2023 / V2 Submittal October-November 2023.
*Files removed from this webpage 5/17/2025.
UNDER REVIEW
CID-23-06 REV 1 - Revisions to 10 Sheets.
- 1st Submittal received 01-02-2025; on TRC-STAFF review early JANUARY 2025; comments to be published 2025-02-11.
- 2nd Submittal received 03-26-2025; on TRC-STAFF review APRIL 2025; comments published 2025-04-20.
FSP-24-20 - Final Subdivision Plat - Phase 1A - UNDER REVIEW - Final plat to subdivide 19.863 acres and record 55 Single-family Attached (Townhome) lots, being Lot Numbers 1-55, and 4 Open Space lots being HOA Common Lots A, B, C, and Open Space G, and 1408 linear feet of new public right-of-ways (Tree Moss Court, Water Nest Drive), 497 Linear Feet of 24' Public Alley (New Pine Alley), and 500 Linear feet of Variable width Public Alley (New Pine Alley). Fee-In-Lieu (FIL) due for unbuilt Greenway per CID/PSP approvals.
- 1st Submittal received 2024-11-01; on TRC-STAFF review during NOVEMBER; comments published on 2024-12-06.
- 2nd Submittal received 2024-12-23; on TRC-STAFF review during JANUARY; comments published on 2025-02-05.
- 3rd Submittal received 2025-03-02; on TRC-STAFF review during MARCH; comments published on 2025-03-17.
- 2025-02-07 - Street Light Poles (8) Fee paid.
- 2025-03-28 - Received SCM Conversion Surety estimate
- 2025-03-28 - Received Greenway Stub Fee-In-Lieu estimate
- 2025-04-30 - Bond estimate #3 under review by Town inspector & engineer.
FSP-24-24 - Final Subdivision Plat - Phase 1B - UNDER REVIEW - Final plat to subdivide 67.026 acres and create/record 33 Single-family Detached (SFD) lots , being Lot Numbers 115-133, 180-193 / and 59 Single-family Attached (Townhome) lots, being Lot Numbers 56-114 / 9 Open Space lots being Open Space Lots #1B (4 different addresses), #4A, #4B (3 different addresses), and #6, and 901 linear feet of 50' public right-of-ways being Granite Knoll Drive, Carved Stone Court / 377 Linear Feet of 60' public right-of-way, Cavalera Way / 1,174 Linear Feet of Variable width Right-of-way, Long Melford Drive.
- 1st Submittal received 2024-12-02; on TRC-STAFF review during DECEMBER; comments published on 01-04-2025.
- WITHDRAWING --> 2nd Submittal received 2025-01-24; on TRC-STAFF review during FEBRUARY; comments to be published by/on 03-10-2025.
- 2nd Submittal received 2025-03-03; on TRC-STAFF review during MARCH; comments published on 2025-03-21.
- 3rd Submittal received 2025-04-01; on TRC-STAFF review during APRIL; comments published on 2025-04-25.
- Street Light pole invoice for 14 Poles is to issued asap.
- Bond for unbuilt infrastructure requires review/approval by Town engineering/inspector.
Updates
Parker Ridge subdivision - Site Blasting to Begin
The civil engineering contractors (Cardinal Civil Contractors) for the Parker Ridge residential subdivision project will commence with ground disturbance including pyrotechnics (ie blasting) beginning May 6th, 2024. Parker Ridge is located on both sides of Redford Place Drive, east of S. Main Street, generally behind the Food Lion shopping plaza and Rolesville Elementary School and west of the Village at Roleville and Cedar Lakes neighborhoods. Please direct any questions or concerns to [*UPDATED 12/2024 - Jonathan Massey jonathan.massey@lennar.com or at 984-484-4665 has replaced Garrick Wier garrick.wier@lennar.com] / 786-778-4511 or cdbquestions@civilblasting.com . Notice Letter provided from contractor to nearby residents is uploaded to the Town's project webpage - https://www.rolesvillenc.gov/sites/default/files/uploads/projects/documents/parker-ridge-notice-of-blasting-letter-2024-05-03.pdf .
Parker Ridge Site construction begins
On Monday, April 8, 2024, construction site work began for the future residential neighborhood called Parker Ridge, located at 201 Redford Place Drive. Construction work for the infrastructure of the neighborhood should continue throughout 2024. UPDATE 12/2024 - Infrastructure Construction is and will be continueing into 2025.
Point of Contact for the Developer, LENNAR, is Jonathan Massey jonathan.massey@lennar.com and 984-484-4665.
Documents
ANX 22-06 - Voluntary Annexation
Traffic Impact Analysis (TIA)
MA 22-03 - Planning Board Meeting - 08/22/2022
MA 22-03 - Planning Board Mtg held 09-26-2022 - Item B.2
MA 22-03 - Town Board Mtg held 11-15-2022 - Item 2
MA 22-03 - Updated Materials - February 2023
MA 22-03 - Town Board Mtg held 02-07-2023
MA 22-03 - Submittal Received 03-02-2023
MA 22-03 - Town Board Mtg held 03-07-2023
PSP-23-02 - APPROVED 12-22-2023
CID-23-06 - Construction Infrastructure Drawings - FINAL/APPROVED
- Approved - CID-23-06 - Stormwater Management Calculations sealed 03-05-2024
- Approved - CID-23-06 - Plans Part 1/5 Sheets 1-23
- Approved - CID-23-06 - Plans Part 2/5 Sheets 24-47
- Approved - CID-23-06 - Plans Part 3/5 Sheets 48-79
- Approved - CID-23-06 - Plans Part 4/5 Sheets 80-108
- Approved - CID-23-06 - Plans Part 5/5 Sheets 109-129
- Approved - CID-23-06 - Drainage and Erosion Calculations
- Approved Wake Co Permit SEC-111977-2023
- REVISION Approval of Wake Co Permit SEC-111977-2023
- REVISION (Sediment Basin)Approval of Wake Co Permit SEC-111977-2023
Developer Notificiation Letter of Blasting dated 2024-05-03
Wake County GIS/911 Addressing Plan for subdivision
FSP-24-20 - Final Subdivision Plat, Phase 1A - V1
- V1 - Application
- V1 - FSP Checklist
- V1 - Prop Owner Consent Form
- V1 - Final Plat dated 11-01-24
- V1 - Certificate of Incumbency
- V1 - Property Deed recorded 2024-04-17
- V1 - LLC Certificate of Authority
- V1 - Owners Association
- V1 - HOA CCR's Declaration-Un-Recorded
- V1 - SCM #1 Maint. Agreement
- V1 - Wake Co Stormwater Agreement
- V1 - Wake Co. Stormwater Final Plat checklist
- V1 - Wake Co Stormwater Improvements Performance Guarantee Agrmt
- V1 - Wake Co WMCPA permit approvals
- V1 - Comments SUMMARY - READ FIRST
- V1 - Comments ENGINEERING Mark-ups
FSP-24-20 - Final Subdivision Plat, Phase 1A - V2
FSP-24-20 - Final Subdivision Plat, Phase 1A - V3
FSP-24-20 - Phase 1A Bond Estimate docs (03-28-2025 )
FSP-24-20, Phase 1A - Bond estimate #3 rcvd 04-30-2025
CID-23-06 REVISION - Construction Infrastructure Drawings - V1
CID-23-06 REVISION - Construction Infrastructure Drawings - V2
FSP-24-24 - Final Subdivision Plat, Phase 1B - V1
- V1 - TOR Development Application submitted
- V1 - TOR FSP Checklist submitted
- V1 - TOR Property Owner Consent Form
- V1 - FINAL PLAT dated 12-2-24 - 5 Sheets
- V1 - Certificate of Incumbency
- V1 - Current Deed of Property (Bk19588/Pg1816)
- V1 - HOA Declaration of CCR's
- V1 - NC Sec State COA for Property owner LLC
- V1 - HOA Articles of Incorporation (AOI)
- V1 - Parker Ridge WMCPA Permit Approval 02-01-2024
- V1 - Wake Co Stormwater Agreement (not fully completed)
- V1 - Wake Co SWFP last page
- V1 - Wet Detention Pond #2 Maintenance Agrmt
- V1 - Wet Detention Pond #3 Maintenance Agrmt
- V1 - Wake Co Stormwater Performance Guarantee Agrmt
- V1 - Comments-SUMMARY-READ FIRST
- V1 - Comments-CORPUD Mark-ups
- V1 - Comments-ENGINEERING Mark-ups